*** Welcome to piglix ***

Ampera Bridge

Ampera Bridge
Ampera Bridge, Palembang.jpg
Coordinates 2°59′30″S 104°45′49″E / 2.9917°S 104.7635°E / -2.9917; 104.7635Coordinates: 2°59′30″S 104°45′49″E / 2.9917°S 104.7635°E / -2.9917; 104.7635
Carries Traffic, pedestrians
Crosses Musi River
Locale Palembang
Official name Jembatan Ampera
Characteristics
Design Vertical lift
Total length 224m
Longest span 61m
Clearance below 9m
History
Opened 30 September 1965

Ampera Bridge is a Vertical-lift bridge in the city of Palembang, South Sumatra, Indonesia, which is the landmark of the city. It connects Seberang Ulu and Seberang Ilir, two regions of Palembang. It can no longer be opened to allow ships to pass.

The bridge was planned during the era of Indonesia's first president, who wanted a bridge that could open and be a match for London's Tower Bridge. The funds for the construction came from Japanese war reparations, with the Fuji Car Manufacturing Co. Ltd being given responsibility for design and construction. However, at the time, Japan had no bridges of this type, and Fuji Car had no bridge-building experience. The official opening was carried out by Minister/Commander of the Army Lieutenant General Ahmad Yani on 30 September 1965, only hours before he was killed by troops belonging to the 30 September Movement. At first, the bridge was known as the Bung Karno Bridge, after the president, but following his fall, it was renamed the Ampera Bridge.

For a few years after it was opened, the center span could be lifted at a speed of approximately 10 meters per minute to allow ships of up to 44.5m in height to pass underneath. However this only occurred a few times, and after 1970 it could no longer be opened. The official reason for this was that the 30 minutes needed to raise the bridge was causing unacceptable delays, and that in any case silting of the river had made it impassable for large ships. However, according to architect Wiratman, who acted as a consultant before the construction, the design of the bridge was flawed from the outset because of the soft mud on which it was built. He maintains that his concerns were ignored for political reasons, and that as the towers' foundations shifted, the bridge deformed to the extent that it could no longer be opened. The ballast weights needed to balance the wight of the bridge were removed in 1990 to prevent possible accidents were they to fall.

The bridge has been changed its colour three times. At the first it was built the colour is grey, but it was changed to be yellow in 1992. And finally since 2002 when Indonesia lead by Megawati as president the Ampera bridge colour is changed again to be red till nowadays.


...
Wikipedia

...