*** Welcome to piglix ***

Ahmedabad-Mumbai Main Line

Ahmedabad–Mumbai Main Line
Overview
Native name अहमदाबाद - मुंबई मुख्य लाइन , અમદાવાદ - મુંબઇ મુખ્ય લાઇન
System Electrified
Status Operational
Locale Gujarat, Maharashtra
Termini Ahmedabad Junction
Mumbai Central
Operation
Opened 20 January 1863
Owner Indian Railways
Operator(s) Western Railway
Technical
Line length 493 km (306 mi)
Number of tracks 2
Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Electrification 25kV 50Hz AC OHLE fully operational
Operating speed up to 160 km/h