*** Welcome to piglix ***

Adambakkam railway station

Adambakkam
Chennai MRTS station
Tracks 2
History
Opened (2013)
Services
Preceding station   Chennai MRTS   Following station
Chennai Beach-St.Thomas Mount
Terminus

Adambakkam is a station under construction on the Chennai MRTS. The station exclusively serves the Chennai MRTS and serves the neighbourhood of Adambakkam.

As of 2014, Adambakkam station was still under construction and is expected to be opened in 2016, as part of the second phase extension of the Chennai MRTS network.

Adambakkam station will be the 20th station on the MRTS line to St. Thomas Mount. In the return direction from St. Thomas Mount, it will be the second station towards Chennai Beach station.

This MRTS Station is being constructed at the western end of the southern arm of Inner Ring Road (IRR).
Major Road access to this station are from

Coordinates: 12°59′22″N 80°11′43″E / 12.989483°N 80.1953°E / 12.989483; 80.1953


...
Wikipedia

...