Acholibur–Gulu–Olwiyo Road | |
---|---|
Route information | |
Length: | 104 mi (167 km) |
History: | Designated in 2015 Expected completion in 2018 |
Major junctions | |
Northeast end: | Acholibur |
Gulu Nwoya Anaka |
|
Southwest end: | Olwiyo |
The Acholibur–Gulu–Olwiyo Road is a road in the Northern Region of Uganda, connecting the town of Acholibur to the city of Gulu and the town of Olwiyo.
The road starts at Acholibur, a small town on the Kitgum–Lira road, approximately 19 kilometres (12 mi) south of Kitgum. The road continues in a southwesterly direction to Gulu (2014 population: 152,276), the most populous city in the Northern Region. The road then continues through Nwoya and Anaka to end at Olwiyo in Nwoya District, a distance of about 150 kilometres (93 mi). The road connects the districts of Kitgum, Pader, Gulu, and Nwoya. The coordinates of the road near Gulu are 2°48'24.0"N, 32°19'29.0"E (Latitude:2.806667; Longitude:32.324722).
In 2009, the Ugandan government commissioned a feasibility study and detailed engineering design for both this road and the Rwekunye–Apac–Aduku–Lira–Kitgum–Musingo Road, each in northern Uganda. The reports became available in 2013. On 21 February 2015, the upgrade from unsealed gravel surface to class II bitumen surface was commissioned by President Yoweri Museveni. The work on the 73 kilometres (45 mi) from Acholibur to Unyama is assigned to China Railway N0-5. Zhong Mei Construction Company will upgrade the 70 kilometres (43 mi) section from Unyama to Olwiyo. Work is expected to last three years. The road project is fully funded by the Ugandan government.
Coordinates: 02°57′03″N 32°16′17″E / 2.95083°N 32.27139°E