*** Welcome to piglix ***

Aberystwyth and Welsh Coast Railway

Aberystwith and Welsh Coast Railway
Overview
Locale Wales
Continues as Cambrian Railways
Operation
Opened 1 July 1863
Closed 5 August 1866
Technical
Line length 86 miles (138 km)
Track gauge 4 ft 8 12 in (1,435 mm)

The Aberystwith and Welsh Coast Railway was a standard gauge railway built in 1863 connecting major towns on the Welsh coast.

Authorised in 1861, the railway was intended to run between the Cardigan Bay towns of Aberystwyth (then spelled Aberystwith) and Porthdinllaen near Nefyn on the Lleyn Peninsula. The plan also included a link with the Newtown and Machynlleth Railway by means of a line from Machynlleth to Ynyslas on the southern shore of the Dyfi estuary opposite Aberdyfi, the Dyfi itself to be bridged at this point.

Work began at Machynlleth, and the line was opened through to Aberystwyth in 1864. However, the planned Dyfi bridge at Ynyslas proved impracticable, requiring the divergence between the Aberystwyth and Coast lines to be moved 6 miles east to Dyfi Junction. This added 12 miles to the journey north from Aberystwyth, but the twisting line – just a few feet above high tide level - between Dyfi Junction and Aberdyfi remains one of the most scenic sections of railway in Britain.

Also abandoned at an early date was the idea of crossing the Lleyn Peninsula in the north, and the last 5 miles beyond Pwllheli were never built.

For a time before completion, southbound passengers detrained at Aberdyfi and were carried over to Ynyslas by ferry, for which a short temporary branch was built for use at low tide.

Major works on the line included the bridge south of Barmouth and the cliff top line at Friog. This latter location was the site of two almost identical accidents, in 1883 and 1933, in which the locomotive plunged to the foot of the cliff leaving the bulk of the train remaining on the track. The locomotive crews were killed in both instances. The topography at this point is demanding, as the existing coast road at a higher level had to be accommodated, as well as a working mine.

The line was extended from Barmouth to Pwllheli via Porthmadog (then Portmadoc) in 1867, the year after it was absorbed into the Cambrian Railways. The company's correct name - as in the five Acts of Parliament it obtained during its life - was spelled Aberystwith: widespread erroneous use (including even the above cited reference) of the modern Aberystwyth spelling stems from mis-transcription in official records, now online. The newer spelling started to come into use in the mid-19th century: Bradshaw's railway timetable commenced using it from c. 1868 but the Cambrian Railways did not adopt the new spelling until April 1892; the older version is still to be found in press references in the early years of the 20th century.


...
Wikipedia

...