*** Welcome to piglix ***

2ES10

"Granite" 2ES10
"ГРАНИТ" (2ЭС10)
2ES10-002.jpg
Type and origin
Power type Electric
Builder Ural Locomotives (Уральские локомотивы)
Order number 221+1
Build date 2010-
Total produced 140 (January 2017)
Specifications
Configuration:
 • UIC 2(Bo'Bo')
Gauge 1,520 mm (4 ft 11 2732 in) Russian gauge
Wheel diameter 1,250 mm (49.2 in)
Length 34 m (111 ft 7 in) (over couplers)
Axle load 24.9 t (24.5 long tons; 27.4 short tons) (245+/-4.9kN)
Loco weight 190–202 t (187–199 long tons; 209–223 short tons)
Electric system(s) 3 kV DC Catenary
Current source Pantograph
Traction motors nose suspended
MU working up to four sections
Loco brake 8,400 kW (11,300 hp) Regenerative
5,600 kW (7,500 hp) Resistive (max.)
Mechanical pneumatic
Performance figures
Maximum speed 120 km/h (75 mph)
Power output

8,800 kW (11,800 hp) short-time

8,400 kW (11,300 hp) continuous
Tractive effort starting: 784 kN (176,000 lbf)
continuous:
538 kN (121,000 lbf) @ 55 km/h (15 m/s)
370 kN (83,000 lbf) @ 120 km/h (33 m/s)
Sources: except where noted
Type and origin
Power type Electric
Builder Ural Locomotives (Уральские локомотивы)
Order number 221+1
Build date 2010-
Total produced 140 (January 2017)
Specifications
Configuration:
 • UIC 2(Bo'Bo')
Gauge 1,520 mm (4 ft 11 2732 in) Russian gauge
Wheel diameter 1,250 mm (49.2 in)
Length 34 m (111 ft 7 in) (over couplers)
Axle load 24.9 t (24.5 long tons; 27.4 short tons) (245+/-4.9kN)
Loco weight 190–202 t (187–199 long tons; 209–223 short tons)
Electric system(s) 3 kV DC Catenary
Current source Pantograph
Traction motors nose suspended
MU working up to four sections
Loco brake 8,400 kW (11,300 hp) Regenerative
5,600 kW (7,500 hp) Resistive (max.)
Mechanical pneumatic
Performance figures
Maximum speed 120 km/h (75 mph)
Power output

8,800 kW (11,800 hp) short-time

8,400 kW (11,300 hp) continuous
Tractive effort starting: 784 kN (176,000 lbf)
continuous:
538 kN (121,000 lbf) @ 55 km/h (15 m/s)
370 kN (83,000 lbf) @ 120 km/h (33 m/s)

8,800 kW (11,800 hp) short-time

The 2ES10 is a twin section (Bo'Bo)(Bo'Bo') freight locomotive manufactured from 2010 by Ural Locomotives. RZD ordered 221 units in 2010. Ukrainian Railways ordered 50 units in 2013.

The 2ES10 is a two unit 8 axle electric freight locomotive manufactured for RZD by Ural Locomotives, a joint venture between Sinara Group of Russia (base platform and auxiliary equipment) and Siemens of Germany (traction electrical equipment).

The 2ES10 offers double the power output of VL11 locomotives, with lower operating and maintenance costs. During trials in August 2010, a three-section 2ES10 hauled a 9,000-tonne (8,900-long-ton; 9,900-short-ton) train across the Urals.

In May 2010, Russian Railways signed an order for 221 2ES10 locomotives. The first prototype locomotive was presented 18 November 2010.

In 2012 the company JSC "Apatite" (ОАО "Апатит") acquired one locomotive, 2ES10-222.

In 2013 Ukrainian Railways sign an agreement to lease 50 2ES10 units as part of a larger 350 locomotive order; the first unit was delivered in Dec. 2013.


...