*** Welcome to piglix ***

200 West Street

200 West Street
(Goldman Sachs Tower)
Goldman sachssewf crop.jpg
as seen from the Hudson River (2010)
General information
Status Complete
Type Office
Location Battery Park City, Manhattan, New York City
Coordinates 40°42′53″N 74°00′52″W / 40.71472°N 74.01444°W / 40.71472; -74.01444Coordinates: 40°42′53″N 74°00′52″W / 40.71472°N 74.01444°W / 40.71472; -74.01444
Construction started 2005
Completed 2010
Opening 2009
Owner Goldman Sachs
Height
Roof 749 ft (228 m)
Technical details
Floor count 44
Floor area 2,099,985 sq ft (195,095.0 m2)
Lifts/elevators 53
Design and construction
Architect Henry Cobb of Pei Cobb Freed & Partners, with Adamson Associates Architects
Developer Goldman Sachs
Structural engineer Halcrow Yolles
Main contractor Tishman Construction Corporation

200 West Street, also known as the Goldman Sachs Tower, is the global headquarters of the Goldman Sachs investment banking firm. The building is a 749-foot-tall (228 m), 44-story building located on West Street, between Vesey and Murray Streets in Lower Manhattan. It is adjacent to the World Financial Center and the Conrad Hotel, the Verizon Building to the east across West Street, and diagonally opposite the World Trade Center. It is the only office building in Battery Park City north of the World Financial Center.

The skyscraper was designed by Henry Cobb of Pei Cobb Freed & Partners, with Adamson Associates Architects, and was erected at the cost of $2.1 billion. The building received a Leadership in Energy and Environmental Design (LEED) gold certification.

The building features an environmentally friendly raised floor underfloor air system. Conditioned air for the occupants is provided by multiple environmental air towers located in the tenant space that deliver 62 °F (17 °C) air into a raised access floor plenum. This underfloor air system provides users with the ability to control their own space temperature as well as improving the ventilation effectiveness. When building churn occurs, workstation moves can be performed more easily with lower cost and less product waste.

Artist Julie Mehretu created a $5 million, 80 by 23 feet (24 by 7 m) mural for the entrance lobby. Between the building and the Conrad New York hotel to its west is a covered pedestrian walkway, with a glass and metal canopy designed by Preston Scott Cohen.

Construction on the building's foundation began in 2005 and faced various problems before completion in late 2009. On December 14, 2007, a nylon sling on a crane failed, sending a 7-ton load to the ground. It crushed two trailers and severely crippled the legs of an architect inside. Work at the site was halted for several days for safety violations. New York City officials halted the project after another construction accident occurred on May 17, 2008. A 30-by-30-inch (760 mm × 760 mm) piece of steel fell eighteen stories onto a neighboring baseball field that was in use by children, though no one was injured. The City issued a stop-work order and cited the general contractor, Tishman Construction, for five violations. Work resumed in the months thereafter.


...