10 Hudson Yards | |
---|---|
Seen in December 2016
|
|
General information | |
Status | Complete |
Type | Office |
Location | 30th Street at Tenth Avenue Manhattan, New York City |
Coordinates | 40°45′09″N 74°00′04″W / 40.752500°N 74.001050°WCoordinates: 40°45′09″N 74°00′04″W / 40.752500°N 74.001050°W |
Groundbreaking | December 4, 2012 |
Management |
The Related Companies L.P. Oxford Properties Group Inc. |
Height | |
Roof | 878 feet (268 m) |
Top floor | 704 feet (215 m) |
Technical details | |
Floor count | 52 |
Floor area | 1,700,698 square feet (158,000.0 m2) |
Lifts/elevators | 27 |
Design and construction | |
Architect | Kohn Pedersen Fox (architect & master planner) |
Website | |
Official website | |
References | |
10 Hudson Yards (also called the South Tower or Tower C) is an office building that was completed in 2016 in Manhattan's West Side. Located near Hell's Kitchen, Chelsea and the Penn Station area, the building is a part of the Hudson Yards urban renewal project, a plan to redevelop the Metropolitan Transportation Authority's West Side Yard. Coach, Inc. is the anchor tenant.
Hudson Yards, conceived through a large master plan by Kohn Pedersen Fox Associates, is expected to consist of 16 skyscrapers containing more than 12,700,000 square feet (1,180,000 m2) of new office, residential, and retail space. Among its components will be six million square feet (560,000 m2) of commercial office space, a 750,000-square-foot (70,000 m2) retail center with two levels of restaurants, cafes, markets and bars, a hotel, a cultural space, about 5,000 residences, a 750-seat school, and 14 acres (5.7 ha) of public open space. 10 Hudson Yards, the first building on the site, is expected to help draw visitors to the area.
Groundbreaking for 10 Hudson Yards occurred on December 4, 2012, with a provisional completion date of 2016. Foundation work continued through the first half of 2013 and the superstructure work began on the tower in August 2013. During excavation work, 70,000 cubic yards (54,000 m3) of soil have been removed and 11,000 cubic yards (8,400 m3) of concrete have been poured. The contract to construct the tower was awarded to a subsidiary of Tutor Perini in March 2013. The tower is the first tower in the Hudson Yards complex to be built, because it is the only Hudson Yards tower not on the artificial platform over the West Side Yards.