100 North Main | |
---|---|
100 North Main
|
|
General information | |
Architectural style | International style |
Location | 100 North Main Street Memphis, Tennessee |
Completed | 1965 |
Height | |
Roof | 430 ft (130 m) |
Technical details | |
Floor count | 37 |
Floor area | 436,272 square feet (40,500 m2) |
Design and construction | |
Architect |
Robert Lee Hall |
One Hundred North Main Building
|
|
NRHP Reference # | 15000187 |
Added to NRHP | April 24, 2015 |
Robert Lee Hall
100 North Main is the tallest building in Memphis, Tennessee. At 430 feet, (131m) it has 37 floors and stands bordering Adams Avenue, North Second Street, and North Main. The building is currently undergoing a multimillion-dollar renovation which will convert the building to a hotel and apartments, with plans to re-open the revolving restaurant on the top floor. It was listed on the National Register of Historic Places in 2015.
Finished in 1965, 100 North Main has remained a focal point of the Memphis riverfront skyline. The building was designed by Robert Lee Hall, the architect of Memphis' largest office building (based on square footage), Clark Tower, as well as Patterson Hall at the University of Memphis.
100 North Main is an almost identical, taller version of the 633 Building in downtown Milwaukee, Wisconsin.
Due to its proximity to various municipal buildings, 100 North Main's tenant base consisted primarily of attorneys, title companies, and various other professionals involved with government business and the courts.
In 2006, the aging office tower was priced for sale at $20 million. Due to limited demand for commercial office space in downtown Memphis, much office space began to decline in value. In January 2012, only 30% of the building was occupied. The building sold for $5 million in August 2013, valuing the building's 436,280 square feet (40,532 m2) of office space at approximately $11 per square foot.
In February 2014, the building's new owners revealed plans to convert the building into apartments and a hotel at a cost of almost $100 million. Construction began in June 2014, after all remaining tenants vacated the building.
Currently, the building stands abandoned and fenced off as of May 2016. The building has been condemned by Shelby County Environmental Court since late 2015 when it was discovered that chunks of concrete were falling from the building's exterior walls, as well as the elevators being inoperable and the fire safety systems not being up to code or functional.