*** Welcome to piglix ***

Hydrodemolition


Hydrodemolition (also known as hydro demolition, hydroblasting, hydro blasting, hydromilling, waterblasting, and waterjetting) is a concrete removal technique which utilizes high-pressure water to remove deteriorated and sound concrete as well as asphalt and grout. This process provides an excellent bonding surface for repair material and new coating applications. First developed in Europe in the 1970s, this technology has become widely accepted for concrete removal and surface preparation throughout Europe and North America.

Hydrodemolition is not used as much for demolition as it is for surface restoration and protection projects. When concrete has deteriorated or the reinforcing steel has begun to corrode, it is necessary to remove any unsound concrete and reinforcing bars (rebar) in order to replace it with new concrete and maintain the integrity of the structure. This process has also been used to remove sound concrete that is not compromised in any way. This may be done to install a preventive cathodic protection system, or to remove concrete in structures in which vibration is a concern. Unlike jackhammers, hydrodemolition does not produce vibrations throughout a structure and therefore does not introduce micro fractures.

“Hydrodemolition can be used for horizontal, vertical, and overhead concrete removal and surface preparation on reinforced and non-reinforced structures. It is effective in removing concrete from around embedded metal elements such as reinforcing steel, expansion joints, anchorages, conduits, shear connectors, and shear studs. Hydrodemolition can be used for localized removals where deterioration is confined to small areas and for large area removals in preparation for a bonded overlay. This technology can also be used to remove existing coatings from concrete.”

The process of hydro scarification (a.k.a. hydroscarification or scarification) uses ultra high pressure water to remove the top surface of a concrete bridge or road surface. Usually the removal is within 1/4" to 3/4" at the most, but can be of any depth above the top layer of rebar. Removal of this type is done in order to provide a good microfracture-free surface for bonding with new, sound concrete. Much like applying oil and chips to an asphalt road, this helps extend the useful life of the bridge decking and road surface by delaying the need for complete replacement.

Another application for hydro scarification is for decontamination, as for example is planned to be used in the Chernobyl New Safe Confinement for the concrete of Unit 4 of the Chernobyl Nuclear Power Plant.


...
Wikipedia

...